logo
 
Back to Tour

Woodsmere New Contruction in Herriman
  • Balcony viewed from lounge
    1068
  • Balcony view from mid staircase
    1067
  • Balcony and staircase
    1066
  • View from top of landing looking down to staircase, half bath below
    1065
  • Towel cupboard on top floor in hallway
    1064
  • Towel cupboard in master bath
    1063
  • Sealing floor now dry ready for tiling
    1062
  • Maizie checks out the banisters
    1061
  • Maizie checks out the banisters on top floor
    1060
  • Main window framework
    1059
  • Main window framework completed
    1058
  • Looking down from end run of banister on top floor
    1057
  • Looking down from between banisters on landing
    1056
  • Left deck column now dry ready for build
    1055
  • Left and right deck column ready for build
    1054
  • Detail framework around window
    1053
  • Coving in Music room
    1052
  • Closet in 2nd Bedroom
    1051
  • Closet in 4th Bedroom
    1050
  • Closet in 3rd Bedroom
    1049
  • Banister Posts in place
    1048
  • Sealing in main bath
    1047
  • Sealing floor for Master Bath
    1046
  • Sealer in Laundry
    1045
  • Sealer for Half Bath
    1044
  • Shelving in Pantry
    1043
  • Shelving in Mud Room, Dog crates go under shelving in far section
    1042
  • Shelving in 3rd Bedroom
    1041
  • Half Bath window sill in place
    1040
  • Front Door detail assembly
    1039
  • Double Doors in place for master bedroom entrance
    1038
  • Doors in place in upstairs hallway
    1037
  • Closet shelving in bedroom2 which is Beth's Room
    1036
  • Close up shot of window frame assembly
    1035
  • Close up shot of door frame assembly
    1034
  • Shower room prepared for tiling
    1033
  • Shower ready for tiling
    1032
  • Doros ready for assembly
    1031
  • Doors ready to fit
    1030
  • Door Assembly
    1029
  • Double Doors ready for assembly in master bedroom
    1028
  • Fireplace in Lounge
    1027
  • Ceiling texture
    1026
  • Looking through office window from outside window, my office desk will go on that wall with my view out the window to the right
    1025
  • Foundation for right column
    1024
  • Foundation for left column viewed from back
    1023
  • Foundation for left coloumn
    1022
  • Foundations for the deck columns have been poured
    1021
  • Nearly home and the sunrise is just starting
    1020
  • Our trail passes the back of the chapel
    1019
  • Our chapel viewed from the west mountains
    1018
  • Our chapel, new house is behind row of houses to the left of the chapel spire
    1017
  • East View
    1016
  • Just great views in the Oquirrh Mountains to the front of the house
    1015
  • Swinging around to the north view with Salt Lake City in the far distance
    1014
  • I think both dogs are looing out to where the new house is being built
    1013
  • This photo of Maizie and Paddington on the walk is taken before the sun rises
    1012
  • This is Paddington who loves the trail walks
    1011
  • We have many trails of walks around this new home, we walk  our dogs at least once a day and usually on this trail which takes about an hour, it's just a few mins walk from this new home.
    1010
  • Texture plaster in upstairs hallway
    1009
  • Texture plaster in stairs to basement
    1008
  • Texture plaster in office
    1007
  • Texture plaster in music room
    1006
  • Texture plaster in master bedroom
    1005
  • Texture plaster in master bathroom
    1004
  • Texture plaster in lounge
    1003
  • Texture plaster in Kitchen
    1002
  • Texture plaster in 4th bedroom
    1001
  • Texture plaster in 2nd bedroom
    1000
  • Texture on ceilings
    999
  • Textrue plaster in lounge and ceiling
    998
  • Doors and floor boards delivered in garage
    997
  • Doors have arrived!
    996
  • Ceiling started
    995
  • Master bathroom sink plumbing
    994
  • Kitchen
    993
  • Kitchen ceiling
    992
  • Close up of balcony
    991
  • Close up of archway to music room
    990
  • Balcony and lounge roof
    989
  • Ready for the plastering - Lounge.  Should start plastering tomorrow
    988
  • Front door viewed from the inside entrance - Obviously no lights inside the house yet and this was taken about 8pm so it looks little dark in the hall way
    987
  • Front door shown opened
    986
  • Front door showing the top framework
    985
  • Front door showing the step assembly
    984
  • Front Door Hung
    983
  • Great room
    982
  • Fireplace in lounge
    981
  • Basment insulation around furnace room
    980
  • Basement main area looking at window to back yard
    979
  • Basement main area insulation
    978
  • Basement long area on back of house, I shall use this as a workshop
    977
  • Basement insulation
    976
  • Basement in main area looking at wall behind stairwell
    975
  • Basement furnace room to the left and hallway to cold storage at end
    974
  • Basement furnace room to right and insulation to left
    973
  • Basement corridoor to cold storage under entrance to house
    972
  • Master bathroom and tub
    971
  • Office two windows in corner
    970
  • View from master bedroom over valley 2
    969
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18