Woodsmere New Contruction in Herriman
  • Kitchen paint sprayed
    1168
  • Nook walls sprayed primer
    1167
  • Lounge and hallway sprayed primer
    1166
  • Landing sprayed with primer and Joshua very pleased about it!
    1165
  • Joshua in door entrance of 2nd bedroom
    1164
  • 4th Bedroom sprayed primer
    1163
  • Staples cemented on chicken wire
    1162
  • Staircase Banister masked for spraying
    1161
  • Fireplace masked for spraying
    1160
  • Fireplace masked for spraying
    1159
  • Banister masked for spraying
    1158
  • Masking windows for paint spray
    1157
  • Masking lounge  for spraying
    1156
  • Masking in nook for painting
    1155
  • Close up of masking
    1154
  • Back door to garage painted and finished
    1153
  • Scaffolding for stuco painting
    1152
  • Preparation for Stuco, house sign between double and single
    1151
  • Barrier below chicken wire
    1150
  • Preparation for stuco
    1149
  • House nearly ready for stuco
    1148
  • Fireplace timber stained
    1147
  • Fireplace and banister stained
    1146
  • Banister at top of stairs
    1145
  • Staircase banister stained
    1144
  • Workman working on the staircase 2
    1143
  • Staircase and banister
    1142
  • Workman working on the staircase
    1141
  • Scaffolding for stuco painting
    1140
  • Rock delivered for house frontage
    1139
  • Preparation for stuco on the outside walls below window - timber, plastic sheeting then chicken wire after which the stuco paint is applied
    1138
  • Preparation for stuco on the outside walls - timber, plastic sheeting then chicken wire after which the stuco paint is applied
    1137
  • Plenty of sunshine  from the south in viewing from the back right of the house
    1136
  • Front of the house still needs preparation for stuco, shakes, lapping board and  rock
    1135
  • Front door viewed from front
    1134
  • Front door being painted with sprayer by workman
    1133
  • Front door being painted with sprayer by workman 2
    1132
  • Front door being painted with sprayer by workman - view from inside of door
    1131
  • Front door being painted by workman
    1130
  • Foundations of left deck column
    1129
  • Foundations nof both columns for deck
    1128
  • Floor covering for  toilet room in master bath in preparation for paint spraying
    1127
  • Floor covering for  master bath in preparation for paint spraying
    1126
  • Floor covering for  main bath room in preparation for paint spraying
    1125
  • Floor covering for  laundry in preparation for paint spraying
    1124
  • Floor covering for  hallway into master bath in preparation for paint spraying
    1123
  • Delivery of rock, this will be used for the front of house inside around the fireplace and lower section of deck columns on back
    1122
  • Delivery of rock close up
    1121
  • Delivery of rock all different shapes and sizes to give depth to rock assembly
    1120
  • Delivery of lapping boards on right of property
    1119
  • Delivery of lapping boards for front of house
    1118
  • Close up of skirting board or base boards for preparation for painting
    1117
  • Back of house view from back garden showing house nearly ready for stuco cement paint
    1116
  • Back of house nearly ready for stuco cement paint
    1115
  • Tile in master bath close up
    1114
  • Lounge preparation for painting
    1113
  • Caulking on tile around master bath
    1112
  • Preparation for Stuco Paint on outside wall - front left view
    1111
  • Preparation for Stuco Paint on outside wall - front left side view
    1110
  • Preparation for Stuco Paint on outside wall - back side left left view
    1109
  • Preparation for Stuco Paint on outside wall - back of single garage and office view
    1108
  • Preparation for Stuco Paint on outside wall - back left view
    1107
  • Preparation for Stuco Paint on outside wall - back left to right view
    1106
  • Shower tiling
    1105
  • scafolding delivery for outside finishing
    1104
  • Scafolding assembly
    1103
  • Scafolding assembly at back of house
    1102
  • Scafolding assembly around deck
    1101
  • Master bathroom tiling
    1100
  • Caulking shelving
    1099
  • Bathroom tiling
    1098
  • Tiling in Master Bath
    1097
  • Tiling in Master Bath from Closet
    1096
  • Tiling in Laundry
    1095
  • Tiling in Half Bath
    1094
  • Deck off Nook
    1093
  • Workers preparing great room for painting
    1092
  • Window carpentry in music room
    1091
  • Main columns in place for doube deck
    1090
  • Main columns in place for deck
    1089
  • Close up of insulation and sheetrock
    1088
  • Bathroom tiles have arrived
    1087
  • House Number Plate
    1086
  • We ordered our address sign by ourselves and saved $250, we went straight to the stone cutter
    1085
  • House number plate delivered today to us
    1084
  • Window carpentry in music room
    1083
  • Workers preparing great room for painting
    1082
  • Main columns in place for doube deck
    1081
  • Main columns in place for deck
    1080
  • Close up of insulation and sheetrock
    1079
  • Bathroom tiles have arrived
    1078
  • Staircase banister in place
    1077
  • Nook window pelmets in place
    1076
  • Master closet view from window
    1075
  • Master closet view from door
    1074
  • Master closet view from corner
    1073
  • Fireplce with trim
    1072
  • Deck columns started
    1071
  • Deck column view through deck
    1070
  • Deck column view from nook window
    1069
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18