Woodsmere New Contruction in Herriman
  • Front right side of house
    1568
  • Sprinkler trenches for frontage
    1567
  • Sprinkler trenches for frontage
    1566
  • Grading and Trenching
    1565
  • Grading and Trenching
    1564
  • Stone for Water Feature delivered
    1563
  • Steps delivered
    1562
  • Rocks Delivered
    1561
  • Posts set for front left with gate in center, viewed from back right
    1560
  • Top section of fence posts on back right
    1459
  • Fence posts from back right
    1458
  • Fence posts in place on back right
    1457
  • Fence posts at back right small section
    1456
  • Posts in place on right side behind electric meter
    1455
  • Posts in place on front right side
    1454
  • Fence workers digging the post holes
    1453
  • Fence workers digging the post holes
    1452
  • Nice deep post holes
    1450
  • Fence holes on front left behind gas meter
    1449
  • Master bath completed -Steve taking the photo
    1448
  • Master bathroom completed
    1447
  • Master bedroom fireplace nearly completed rock surround
    1446
  • Kitchen sink completed with back splash
    1445
  • Kitchen looking very nice
    1444
  • Kitchen completed with back splash
    1443
  • View form the Deck looking down on stairs to concrete pad
    1442
  • Back Yard Graded with pile of stones left for Lesley-Ann's Rockery that I have to build
    1441
  • Steps from garage to house
    1440
  • Grading back yard
    1439
  • Grading back yard for city inspection
    1438
  • Front steps completed
    1437
  • Front concrete work completed
    1436
  • Deck stairs down to ground
    1435
  • Deck stairs completed
    1434
  • Half bath assembled with oval mirror
    1433
  • Workman working stairs late at night to get finished
    1432
  • Rocks in centre moved from grading
    1431
  • Kitchen cleaned
    1430
  • Great concrete pad under deck showing drain hose to landscape
    1429
  • Drain hose from under concrete pad
    1428
  • Concrete pad on back garage door
    1427
  • Concrete pad completed under deck
    1426
  • Cleaner Carl cleaning the bathroom
    1425
  • Template for front stairs and pathway
    1424
  • Railings ready for stairs to be built off
    1423
  • railings on side of nook deck
    1422
  • Railings on nook deck
    1421
  • Railing on deck
    1420
  • Problem with air con and access needed through hole in wall to repair
    1419
  • Mirror in place in main bathroom
    1418
  • First mirror in place in master bathroom
    1417
  • Cementing under deck
    1416
  • Cementing driveway
    1415
  • Cement finishing on drive way
    1414
  • Air conditioning units on left of property
    1413
  • Wild deer helping themselves to neighbour plants
    1412
  • Template for pouring concrete
    1411
  • Grading completed for back
    1410
  • Grading back left of yard
    1409
  • Pan view from back of property
    1408
  • Gravel in pad ready for concrete
    1407
  • Front steps template for concretee
    1406
  • Fridge installed
    1405
  • Ready for pouring concrete drive way
    1404
  • Pathway to front of house
    1403
  • Curb cut-away and gravel laid for concrete
    1401
  • That's a lot of dirt I have to move
    1400
  • That's a funny pic of the housefrom back right of property
    1399
  • Template for steps to front door
    1398
  • Grading front
    1397
  • Drive and pathway marked out
    1396
  • Drain pipes in place under pad
    1395
  • Now that's a lot of rocks!
    1394
  • Grading for fencing
    1393
  • Grading for fencing on front left side of house
    1392
  • Grading down for fencing
    1391
  • Drive way cut out in curbing
    1390
  • Grading concrete pad
    1389
  • Grading right back of property
    1388
  • Grading front for drive way cement
    1387
  • Grading front drive way, there's our truck
    1386
  • Grading for cement under deck
    1385
  • Grading for back garage door
    1384
  • Grading around rock columns
    1383
  • House completed painting
    1382
  • Front house colours looking good
    1381
  • Front of house painted
    1380
  • Painting completed on back of house
    1379
  • Basement wall painted
    1378
  • Rough grading the back yard
    1377
  • Rough grading on  back of garage door
    1376
  • Front of house  ready for concrete
    1375
  • Back of house painted and rock columns in place
    1374
  • This is a big project for me to move these rocks when working the back garden
    1373
  • rough grading on back yard
    1372
  • Grading front for landscaping
    1371
  • Back yard rough grading
    1370
  • Shower fittings in place
    1369
  • Main bathroom
    1368
  • Lounge carpet in place
    1367